NePool Operating Procedures

 

 

NEPOOL Operating Procedure No. 1 Central Dispatch Operating Responsibility And Authority Of ISO New England, The Satellites And Participants

08/19/98

NEPOOL Operating Procedure No. 2 Maintenance Of Communications, Computers, Metering, And Computer Support Equipment

08/19/98

Appendix A

Itemized Equipment Maintenance of Communications, Computers, Metering and Building Services

08/19/98

Appendix B

ISO/Satellite/SCADA Center OP #2 Staff

08/19/98

Appendix C

Equipment Outage Request Form

08/19/98

Appendix D

Approved Scheduled Maintenance Report

08/19/98

NEPOOL Operating Procedure No 3

Transmission Maintenance Scheduling For Facilities Operating At 115 KV And Above

10/09/98

Appendix A

Interpool Transmission Facilities

10/09/98

NEPOOL Operating Procedure No 4

Action During A Capacity Deficiency

10/30/98

Nepool Operating Procedure No. 5 Not published from NePool  

NEPOOL Operating Procedure No 6

System Restoration

08/19/98

NEPOOL Operating Procedure No 7

Action In An Emergency

8/19/98

NEPOOL Operating Procedure No 8 Operating Reserve And Automatic Generation Control

10/30/98

Nepool Operating Procedure No. 9 Not published from NePool  

NEPOOL Operating Procedure No 10

Analysis And Reporting Of Power System Emergencies

10/30/98

Appendix A

ISO New England Emergency Communications Plan

10/30/98

Appendix B

DOE And State Regulatory Agency Report Criteria

10/30/98

Appendix C

Agency Reports of Major System
Disturbance/ Outage/ Incident

10/30/98

Appendix D

Preliminary Report Of Analysis Of Abnormal Bulk Power System Events

10/30/98

NEPOOL Operating Procedure No 11

Black Start Capability Testing

08/19/98

NEPOOL Operating Procedure No 12

Voltage And Reactive Control

08/19/98

NEPOOL Operating Procedure No 13

Standards For Voltage Reduction And Load Shedding Capability

09/23/98

Nepool Operating Procedure No. 14 Not published from NePool  
Nepool Operating Procedure No. 15 Not published from NePool  
Nepool Operating Procedure No. 16 Not published from NePool  

NEPOOL Operating Procedure No 17

Load Power Factor Correction

09/24/98

Nepool Operating Procedure No. 18 Not published from NePool  
NEPOOL Operating Procedure No 19 Transmission Operations

09/08/98

Appendix A

Methods And Criteria Overview

09/08/98

Appendix B

Thermal Capacity Ratings For Transmission Facilities

09/08/98

Appendix C

345 kV Stuck Breaker Contingencies That Can Have Unacceptable Inter-Area Impacts

09/08/98

Appendix D

New England 345 kV Double Circuit Tower Lines

09/08/98

Appendix E

Extreme Contingencies

09/08/98

Appendix F

Summary Of OP19 - Transmission Operations

09/08/98

Appendix G

Screening Method For Determining If A Stuck Breaker Contingency Has Unacceptable Inter-Area Impact

09/08/98

Appendix H

General List Of Dispatch Actions To Minimize Cost Of Stuck Breaker Protection

09/08/98